![]() Analytically determine the steady-state frequency error in Hz following this contingency. The contingency is the loss of the generator at bus 50, which initially has 42.1 MW of generation. Each generator is modeled using a two-axis machine model, an IEEE Type 1 exciter and a TGOV1 governor with R = 0.05 per unit (a summary of the generator models is available by selecting either Stability Case Info, Transient Stability Generator Summary which includes the generator MVA base, or Stability Case Info, Transient Stability Case Summary). ![]() This problem has been solved: Solutions for Chapter 12 Problem 11P: Open PowerWorld Simulator case in this Problem, which includes a transient stability representation of the system from Example 1.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |